New Kawasaki GPB80D cogeneration plant





If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.
Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.
Do not buy products which price is too different from the average price for similar equipment.
Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.
The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.
- Transfer of prepayment to the card
- Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
- Transfer to the “Trustee” account
- Such a request should be alarming, most likely you are communicating with a fraudster.
- Transfer to a company account with a similar name
- Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
- Substitution of own details in the invoice of a real company
- Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.
Seller's contacts









Technical Datasheet
Manufacturer: Kawasaki Heavy Industries
Japan
Gas Turbine Model: M7A 03D
Fuel: Natural Gas
Generator Voltage/Frequency: 6.3 kV / 50 Hz
Design Conditions (ISO)
Ambient Temperature 15 °C
Atmospheric Pressure 101.32 kPa
Relative Humidity 60 %
Fuel Type Natural Gas
Load 100 %
Simple Cycle Performance
Power Output 7,490 kW
Thermal Efficiency 32.6 %
Heat Rate 11,050 kJ/kWh
Fuel Consumption 2,289 Nm3/h
Exhaust Temperature 529 °C
Exhaust Flow 97.06 t/h
Major Overhaul Interval 35,000 EOH
Emission Data
NOx (15% O2) 15 ppmvd
CO (15% O2) 25 ppmvd
VOC (15% O2) 2 ppmvd
Major Scope of Supply
Gas Turbine M7A 03D
Reduction Gearbox (1500 rpm
Hitachi)
Starting System (Toshiba)
Fuel Gas System with EOV & SSV
Lubrication System with pumps
cooler and filters
6.3 kV Generator (Nishishiba Electric)
Control & Monitoring System (Omron)
Air Intake System with 3 stage filtration
Exhaust System with silencer
Acoustic Enclosure
Fire & Gas Detection System
Instrumentation and metering device
Express Financing Get Pre-Approved
Get a FR8Star Shipping Estimate